Hello guys.
Hope you all are doing well. I have been facing problem while working in Transport management module.
My scenario is based on P2P route. In which multi segment is to be used. I have created 1 Warehouse and 2 hubs.
These hubs are called as Truck Adda. A Route Plan and route guide is also created.
I am unable to complete this scenario and need guidance to execute the scenario completely without using manual rate and route.
Scenario:
When order is received. Transport contractor is intimidated to send the particular vehicle (as per loads capacity). The vehicle arrives and the items are loaded. Vehicle leaves the Warehouse with supporting documents and off load the items to first Truck Adda. This truck Adda provides the temporary storage and transport service also.
Now the items are loaded to another vehicle provided by this first truck adda which will deliver the same load to another second truck adda which is always a point in customer’s city. From here the customer will show the supporting documents (Bilti) and get the order release.
Reason of using two different transport services is, that when the order is not delivered directly to customer.
I have been following these below links and trying to execute this full scenario. But I don’t get specific rate and route using Rate route Workbench and also unable to understand how this calculation will work.
http://www.bhsolutions.com/news/blog/rate-for-multiple-segments-of-a-load/
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/transportation/plan-freight-transportation-routes-multiple-stops
Note: My 1st contract transport charges Per KM. The 2nd transporter charges per piece.
In the end I would really appreciate and be thankful to all of you helping me in this regard.
Thanks and Best Regards,
Maysum Abbas